Showing 17–32 of 35 results
Foam Molding Machine MPH 80/60 is used for producing foam replicas from pre-expanded polystyrene beads. This equipment is specifically designed for the lost foam process.
Foam Molding Machine MPH 100/100 is used for producing foam replicas from pre-expanded polystyrene beads. This equipment is specifically designed for the lost foam process.
Foam Molding Machine MPH 120/120 is used for producing foam replicas from pre-expanded polystyrene beads. This equipment is specifically designed for the lost foam process.
Foam Molding Machine MPV 100/100 is used for producing foam replicas from pre-expanded polystyrene beads. This equipment is specifically designed for the lost foam process.
Foam Molding Machine MPV 80/60 is used for producing foam replicas from pre-expanded polystyrene beads. This equipment is specifically designed for the lost foam process.
Foam Molding Machine MPV 120/120 is used for producing foam replicas from pre-expanded polystyrene beads. This equipment is specifically designed for the lost foam process.
The Foam Replica Machine 4228 MKI is designed for bonding foam sections of replicas together with hot melt glue.
The Foam Replica Machine 5728 is designed for bonding foam sections of replicas together with hot melt glue.
The Foam Replica Machine 5730 is designed for bonding foam sections of replicas together with hot melt glue.
The Foam Replica Machine IL 3030 is designed to rapidly and accurately glue foam assemblies for Lost Foam castings together. Because of its unique design, the machine allows maximum productivity by allowing the operator to unload assembled patterns and load loose segments while the machine is in the process of completing assemblies. This capability ensures that overall machine utilization is optimized.
The Horizontal-Axis Compaction system is a patented vibratory sand compaction system for processing lost foam flasks.
This hydraulically operated Mold Push Off Unit separates molds from the bottom boards and discharge them on to the shake out.
Quench tank to be located in line with the scalping conveyor (or positioned convenient to an extraction robot) for the quenching of the casting clusters.
Sand Prefill System for applying bed sand to the flask. This enables cluster insertion prior to fill/compact. The prefill system allows more fill/compact time and/or faster cycle time. Also, a Cluster Insertion Station will be provided for the insertion of the assembled cluster into the flask. This allows the preferred orientation of the cluster for the fill/compact cycle, pouring and/or dumping process.
Mold Closing Device to accept cope and drag halves after core setting, and mate the halves for transfer to the mold conveyor system. Drag halves will be picked from the coring line and placed on a bottom board supported by a reversible powered roller conveyor. Clamping fixture will return to the cope, lift and rotate the cope and close the mold on the bottom board.
Boiler and Steam System